Investment
Refurbishment
Development
Investment
Refurbishment
Darmouth Street,
London
Holloway Road Campus
450,000 sq ft
The basis for a multi-million pound refurbishment project, we prepared a BIM Level 2-ready, 3D model of the campus. This full data set supported workable 2D drawings for architects and contractors. An elevation survey of the tower allowed the façade consultants to replace defective panels. We also mapped underground services as well as plant and machinery.
Development
Shepcote Lane,
Sheffield
Investment
Refurbishment
Development
Investment
Refurbishment
Development
Related Case Studies
125 Deansgate,
Manchester
200,000 sq ft prime office
£60m loan
dsds
Residential
Energy &
Impact
Protos,
Cheshire
Energy &
Impact
Protos,
Cheshire
Energy &
Impact
50,000 sq ft offices
£40m loan
367,000 sq ft industrial/logistics unit
£38m loan
Energy & resource hub
£23m loans
50,000 sq ft offices
£40m loan
367,000 sq ft industrial/logistics unit
£38m loan
Energy & resource hub
£23m loans
Energy & Impact
Residential
Kings House,
Brighton
70 unit, residential
£30m loan
Residential
Residential
Kings House,
Brighton
70 unit, residential
£30m loan