100
Space Options
Building
200
Home
Building 100
Building 200
Contact
Building
Labor Stats
About
Building 100
Building 200
Space Options
Located just 1.4 miles from I-20 E and 20 miles from I-285, Dogwood Logistics Center offers a strategic advantage for servicing the growing Atlanta MSA.
Featuring a 36’ minimum clear height and heavy auto parking, Dogwood Logistics Center is perfectly suited for best-in-class tenants looking to optimize their footprint.
UP TO 392,830 SF FOR LEASE
1.07/1,000
Auto Parking PSF
Additional Features: Clerestory Windows, Warehouse Walls Painted White, Louvers / Exhaust to Maintain 1.5 Air Changes per Hour
About
36'
Clear Height
220'
Shared Truck Court with 60' Concrete Aprons
ESFR
Sprinkler System
30 FC
LED Light Fixtures
2025 Blue Collar Residents
2025 Blue Collar Jobs
2025 Logistics Employees
2025 Logistics Jobs
5 Yr Population Growth (%)
Shipping & Receiving Clerk Avg. Wage
Avg. Logistics Employee Avg. Wage
Labor Stats
55,210
38,098
12,697
4%
$19.64/hr
$22.33/hr
23,101
Location
Brochure
Location
Within a 30 Minute Drive
41,634
Warehousing & Logistics Workers
376,299
Total Employees
727,711
Total Population
2810 Dogwood Dr SE
Conyers, Georgia 30013 USA
Contact Us
This website has been prepared by Colliers for advertising and general information only. Colliers makes no guarantees, representations or warranties of any kind, expressed or implied, regarding the information including, but not limited to, warranties of content, accuracy and reliability. Any interested party should undertake their own inquiries as to the accuracy of the information. Colliers excludes unequivocally all inferred or implied terms, conditions and warranties arising out of this document and excludes all liability for loss and damages arising there from. This publication is the copyrighted property of Colliers and/or its licensor(s). ©2026. All rights reserved.
Colliers Atlanta1230 Peachtree Street NE | Suite 800Atlanta, GA, 30309+1 404 888 9000
Harrison Marsteller
Executive Vice President, Principal
+1 404 877 9219
harrison.marsteller@colliers.com
Logan Devereaux
Associate
+1 770 696 3092
logan.devereaux@colliers.com
James Feiber
Associate
+1 404 991 4887
james.feiber@colliers.com

Building 100
Property Type
Class
Total SF
Office SF
Dimensions
Site Acres
Year Built
Clear Height
Framing
Roof Finish
Exterior
Auto Parking
Docks
Dock Bay Depth
Drive-Ins
Fire Suppression
Lighting
HVAC
Rear-Load Distribution
A
205,237
2,200
884’ x 230’
30.97
2026
36’
Tilt-Wall
TPO
Concrete
210 Spaces
65
60’
2
ESFR
Stumble Lighting
Freeze Protection Only
Building 100
205,237 SF
Contact
Brochure
Building 200
Site Plan
Home
Colliers Atlanta1230 Peachtree Street NE | Suite 800Atlanta, GA, 30309+1 404 888 9000
This website has been prepared by Colliers for advertising and general information only. Colliers makes no guarantees, representations or warranties of any kind, expressed or implied, regarding the information including, but not limited to, warranties of content, accuracy and reliability. Any interested party should undertake their own inquiries as to the accuracy of the information. Colliers excludes unequivocally all inferred or implied terms, conditions and warranties arising out of this document and excludes all liability for loss and damages arising there from. This publication is the copyrighted property of Colliers and/or its licensor(s). ©2026. All rights reserved.
Harrison Marsteller
Executive Vice President, Principal
+1 404 877 9219
harrison.marsteller@colliers.com
Logan Devereaux
Associate
+1 770 696 3092
logan.devereaux@colliers.com
James Feiber
Associate
+1 404 991 4887
james.feiber@colliers.com
Contact Us
Building 100

Building 200
Property Type
Class
Total SF
Office SF
Dimensions
Site Acres
Year Built
Clear Height
Framing
Roof Finish
Exterior
Auto Parking
Docks
Dock Bay Depth
Drive-Ins
Fire Suppression
Lighting
HVAC
Building 200
187,593 SF
Contact
Brochure
Building 200
Site Plan
Home
Colliers Atlanta1230 Peachtree Street NE | Suite 800Atlanta, GA, 30309+1 404 888 9000
This website has been prepared by Colliers for advertising and general information only. Colliers makes no guarantees, representations or warranties of any kind, expressed or implied, regarding the information including, but not limited to, warranties of content, accuracy and reliability. Any interested party should undertake their own inquiries as to the accuracy of the information. Colliers excludes unequivocally all inferred or implied terms, conditions and warranties arising out of this document and excludes all liability for loss and damages arising there from. This publication is the copyrighted property of Colliers and/or its licensor(s). ©2026. All rights reserved.
Harrison Marsteller
Executive Vice President, Principal
+1 404 877 9219
harrison.marsteller@colliers.com
Logan Devereaux
Associate
+1 770 696 3092
logan.devereaux@colliers.com
James Feiber
Associate
+1 404 991 4887
james.feiber@colliers.com
Contact Us
Rear-Load Distribution
A
187,593
2,200
884’ x 210’
30.97
2026
36’
Tilt-Wall
TPO
Concrete
210 Spaces
65
60’
2
ESFR
Stumble Lighting
Freeze Protection Only
Building 100
