Madison Logistics Park
200-Acre Master Planned Industrial Park
ANDERSON, IN
Contact Us
Why Anderson
Concept Site Plan
Location Overview
Location Overview
15 MIN
30 MIN
60 MIN
Drive Times
Amenities
Anderson + Madison County Higher Education
Education
•
•
•
•
•
•
Master planned industrial park with new construction options available from 40,000 – 730,000 SF
Heavy auto and trailer parking options available
Immediate access to I-69 with interstate frontage
Adjacent to Anderson’s significant amenity base
Access to strong labor pool
Real property tax abatement and other incentives available
Highlights
Concept Site Plan
2,029,120 SF
Total Campus
Click on any building below to see planned specifications
Building I
Building SF
Planned Clear Height
Configuration
Loading Docks/Drive-ins
Auto Parking
Trailer Parking
105,000 SF (divisible to ± 50,000 SF)
28’ - 32’
Rear-load (500’ w x 210’ d)
TBD
105 spaces (expandable to 210)
29 dedicated spaces
Building II
Building SF
Planned Clear Height
Configuration
Loading Docks/Drive-ins
Auto Parking
Trailer Parking
308,000 SF (divisible to ± 150,000 SF)
32’ - 36’
Rear-load (940’ w x 320’ d)
TBD
301 spaces (expandable to 602)
62 dedicated spaces
Building III
Building SF
Planned Clear Height
Configuration
Loading Docks/Drive-ins
Auto Parking
Trailer Parking
730,080 (divisible to ± 350,000 SF)
36’ - 40’
Cross-docked (1404’ w x 520’ d)
TBD
442 spaces (expandable to 660)
393 dedicated spaces
Building IV
Building SF
Planned Clear Height
Configuration
Loading Docks/Drive-ins
Auto Parking
Trailer Parking
457,380 SF
36’ – 40’
Cross-docked (1089’ w x 420’ d)
TBD
322 spaces
139 spaces
Building V
Building SF
Planned Clear Height
Configuration
Loading Docks/Drive-ins
Auto Parking
Trailer Parking
80,000 SF
28’ – 32’
Rear-load (500’ w x 160’ d)
TBD
110 spaces
30 spaces
Building VI
Building SF
Planned Clear Height
Configuration
Loading Docks/Drive-ins
Auto Parking
Trailer Parking
80,000 SF
28’ – 32’
Rear-load (500’ w x 160’ d)
TBD
110 spaces
30 spaces
Building VII
Building SF
Planned Clear Height
Configuration
Loading Docks/Drive-ins
Auto Parking
Trailer Parking
338,940 SF
36’ – 40’
Cross-docked (420’ w x 807’ d)
TBD
322 spaces
87 spaces
Why Anderson
Indiana has earned a stand-out reputation for its business-friendly leadership, economic health, and accessibility. Earning its name as the Crossroads of America — central Indiana is located within an 8-hour drive to over 40 major metropolitan cities.
Madison Logistic Park’s location is served by 27 airports within 50 miles — and positioned along the I-69 Corridor.
Crossroads of America
Indianapolis International Airport (IND)
adjacent to FedEx’s 2ND largest U.S. distribution hub
ranked 8TH largest freight airport in U.S.
9TH consecutive year, earns “Best Airport in North America”
•
•
•
Great Proximity To Major Airports
IN – Ft Wayne + Indy
IL – Midway + O’Hare
KY – Lexington + Louisville
OH – Columbus + Dayton
•
•
•
•
8
interstate systems connect Indiana to the country
40+
major metropolitan areas within an 8-hr drive
75%
U.S. + Canada population within a 1-day drive
See Why Indiana has the Best Business Climate
2nd
in U.S, for Business Competitiveness
2019 Site Selection Magazine
2nd
consecutive years as #5 in U.S. for Best Business Climate
2019 Chief Executive Magazine
4th
in U.S. Best for Doing Business
2019 CNBC Business News
5th
best in U.S. for Healthy Labor Environment
2019 Area Development Magazine
7th
in U.S. for Corporate Tax Environment
2019 Area Development Magazine
Best Business Climate
JASON SPECKMAN SIOR
317.713.2115
jason.speckman@colliers.com
JEORGE MANLEY
317.713.2124
jeorge.manley@colliers.com
Download Brochure
53rd St
Scatterfield Rd
This site is not maintained by Colliers International Group Inc. or its affiliates (“Colliers”). Any use of this site, and any information you provide to this site, will be governed by the terms and conditions of this site, including those relating to confidentiality, data privacy and security. Colliers is not responsible for the information and content on this site. You are encouraged to review the privacy and security policies of this site, which may be different than those maintained by Colliers.
This site is not maintained by Colliers International Group Inc. or its affiliates (“Colliers”). Any use of this site, and any information you provide to this site, will be governed by the terms and conditions of this site, including those relating to confidentiality, data privacy and security. Colliers is not responsible for the information and content on this site. You are encouraged to review the privacy and security policies of this site, which may be different than those maintained by Colliers.
This site is not maintained by Colliers International Group Inc. or its affiliates (“Colliers”). Any use of this site, and any information you provide to this site, will be governed by the terms and conditions of this site, including those relating to confidentiality, data privacy and security. Colliers is not responsible for the information and content on this site. You are encouraged to review the privacy and security policies of this site, which may be different than those maintained by Colliers.
Contact Us
Why Anderson
Concept Site Plan
Location Overview
Concept Site Plan
2,029,120 SF
Total Campus SF
Click on any building below to see planned specifications
Building I
Building SF
Planned Clear Height
Configuration
Loading Docks/Drive-ins
Auto Parking
Trailer Parking
105,000 SF (divisible to ± 50,000 SF)
28’ - 32’
Rear-load (500’ w x 210’ d)
TBD
105 spaces (expandable to 210)
29 dedicated spaces
Building II
Building SF
Planned Clear Height
Configuration
Loading Docks/Drive-ins
Auto Parking
Trailer Parking
308,000 SF (divisible to ± 150,000 SF)
32’ - 36’
Rear-load (940’ w x 320’ d)
TBD
301 spaces (expandable to 602)
62 dedicated spaces
Building III
Building SF
Planned Clear Height
Configuration
Loading Docks/Drive-ins
Auto Parking
Trailer Parking
730,080 (divisible to ± 350,000 SF)
36’ - 40’
Cross-docked (1404’ w x 520’ d)
TBD
442 spaces (expandable to 660)
393 dedicated spaces
Building IV
Building SF
Planned Clear Height
Configuration
Loading Docks/Drive-ins
Auto Parking
Trailer Parking
457,380 SF
36’ – 40’
Cross-docked (1089’ w x 420’ d)
TBD
322 spaces
139 spaces
Building V
Building SF
Planned Clear Height
Configuration
Loading Docks/Drive-ins
Auto Parking
Trailer Parking
80,000 SF
28’ – 32’
Rear-load (500’ w x 160’ d)
TBD
110 spaces
30 spaces
Building VI
Building SF
Planned Clear Height
Configuration
Loading Docks/Drive-ins
Auto Parking
Trailer Parking
80,000 SF
28’ – 32’
Rear-load (500’ w x 160’ d)
TBD
110 spaces
30 spaces
Building VII
Building SF
Planned Clear Height
Configuration
Loading Docks/Drive-ins
Auto Parking
Trailer Parking
338,940 SF
36’ – 40’
Cross-docked (420’ w x 807’ d)
TBD
322 spaces
87 spaces
Why Anderson
Location
Why Anderson
Contact Us
Why Anderson
Concept Site Plan
Location Overview
Crossroads of America
Indiana has earned a stand-out reputation for its business-friendly leadership, economic health, and accessibility. Earning its name as the Crossroads of America — central Indiana is located within an 8-hour drive to over 40 major metropolitan cities. Madison Logistic Park’s location is served by 27 airports within 50 miles — and positioned along the I-69 Corridor.
Indianapolis International Airport (IND)
adjacent to FedEx’s 2ND largest U.S. distribution hub
ranked 8TH largest freight airport in U.S.
9TH consecutive year, earns “Best Airport in North America”
•
•
•
Great Proximity To Major Airports
IN – Ft Wayne + Indy
IL – Midway + O’Hare
KY – Lexington + Louisville
OH – Columbus + Dayton
•
•
•
•
8
interstate systems connect Indiana to the country
40+
major metropolitan areas within an 8-hr drive
75%
U.S. + Canada population within a 1-day drive
See Why Indiana has the Best Business Climate
Best Business Climate
2nd
in U.S, for Business Competitiveness
2019 Site Selection Magazine
2nd
consecutive years as #5 in U.S. for Best Business Climate
2019 Chief Executive Magazine
4th
in U.S. Best for Doing Business
2019 CNBC Business News
5th
best in U.S. for Healthy Labor Environment
2019 Area Development Magazine
7th
in U.S. for Corporate Tax Environment
2019 Area Development Magazine
Contact Us
Site Plan