In 2023, Bally’s opened Chicago’s first-ever casino in the historic Medina Temple downtown. The temporary location is the first of a $1.6B multi-phase resort development that will be located on the site of the former of the hotel Chicago Tribune Publishing Center. With completion planned for 2026, the 500-room hotel and casino includes a theatre and an extension of the Chicago Riverwalk. On behalf of Bally’s, our team is handling all pre-construction and construction-related contracts for all phases, as well as community buy-in agreements, tax contributions, compliance with diversity and inclusion and local hiring requirements.
Bally's Chicago
Micron is constructing a leading-edge memory manufacturing fab, the first to be built in the US in 20 years. This $15B, R&D and manufacturing center is expected to come online in 2025, with DRAM output starting in 2026. The planned 600,000 sq foot cleanroom, the size of 10 football fields, is the largest single cleanroom in the country. Prioritizing sustainability, plans for the project include 100% water reuse, recycling, and restoration; and 100% renewable electricity. On behalf of Micron, our team is preparing and negotiating every owner representative, construction, trade, and design related agreement, requiring in-depth understanding of the CHIPS Act, DEI initiatives, sustainability, and insurance requirements.
Micron: Idaho Fab
The East Coast debut of MGM Resorts, this 24-story, 300+ room integrated resort casino sits on the Potomac River across from Washington, DC. The $1.5 B, LEED Gold-certified resort features a host of amenities, including an impressive conservatory displaying seasonal botanical exhibits in a 85-ft tall glass atrium. Involved from the ground up, our team negotiated and drafted all construction contracts and handled the insurance and risk management profile. Post-completion, we advised on project closeout agreements, claims, and claims resolution, including successfully arbitrating a multimillion-dollar design defect claim.
MGM National Harbor
Opened in December 2023, this 67-story, 3,500+ room hotel and convention space is built on a 24.5-acre site that includes a 65,000 sq ft theater, as well as retail, dining, spa, and gaming. The project was partially constructed, abandoned; and then purchased by our client, the owner, out of Chapter 11. Our team prepared and negotiated every direct trade and design related agreement, including assisting with Day 1 project closeout activities, and prepared all Day 2 agreements (construction, trade, and design) not part of the original construction. We also assisted in preparing and negotiating numerous agreements relating to ongoing operations.
Fontainebleau Las Vegas
The 65,000-seat stadium was completed in 2020 on time and on budget, despite significant disruptions from the COVID pandemic. Unique features of the $2 billion project include a translucent dome, retractable field tray, and the 93-foot Al Davis Memorial Torch. As counsel to the Las Vegas Raiders, our team handled every aspect of development and construction of the stadium from dirt through completion and opening. Our team continues to handle all facets of operating the stadium, including sponsorship and event contracts.
Allegiant Stadium