SPORTS
Development
Services
QUICK STATS
Mike Plant
Atlanta Braves President, Development
Everyone told us that they [Kimley-Horn] were the perfect firm for this job, and it’s been true from Day 1, when we purchased the property. They’ve run point-on engineering and due diligence, then getting approvals and working on infrastructure access. They’re sharp,
top-notch, can-do people.
FULL
SERVICE
CONSULTING
85+
ACROSS
offices
THE COUNTRY
100+
SPORTS FACILITY
PROJECTS
4,000+
EMPLOYEES
NATIONWIDE
gameday experience
SUNTRUST PARK AND
THE BATTERY ATLANTA
LAS VEGAS
STADIUM
MERCEDES-BENZ
STADIUM
BB&T
BALLPARK
COLORADO STATE UNIVERSITY CANVAS STADIUM
THE STAR IN
FRISCO
Circuit of the
Americas
Target
Field
power plays
• Predevelopment Services
• Feasibility Studies and Due Diligence
• Entitlements and Permitting
• Land Planning
• Site Civil Engineering
• Multi-modal Transportation
• Engineering and Planning
• Transit Services Planning and Design
• Event Traffic Management
• Parking Consulting and Design
• Rideshare and Autonomous Vehicle Planning
• Landscape Architecture and Urban Design
• Public Involvement
• Structural Engineering
• Roadway and Bridge Design
• Utility Design and Coordination
• Sustainability Design and LEED
• Emergency Evacuation Modeling
• Field Turf Design
• Security Infrastructure Design
• Construction Phase Services
We bring together a collaborative, innovative, and solutions-oriented approach
to provide seamless coordination and a deep resource pool to meet aggressive timelines.
Services specific to sports facilities include:
bench strength
Live Nation
160+ sites over the
past 3 years
Circuit of
the americas
Designed traffic management plan
target field
Improved pedestrian
flow and safety
our services at work
Levi’s Stadium
Decreased
exit times by 40%
BB&T Ballpark
Increased
attendance
Mercedes-Benz Stadium
Money savings
Teams we’ve partnered with
Contact one of our
Development Services
professionals today!
OUR WEBSITE
Subsequent to opening season, Kimley-Horn decreased exit times by 40%
at Levi’s Stadium in the San Francisco Bay Area through
a series of event-specific traffic operations plans.
A world-class design for this Uptown Charlotte stadium and a revised traffic management plan for the surrounding street grid helped to move BB&T Ballpark from last in Triple-A Minor League Baseball attendance to first place.
At Mercedes-Benz Stadium, where schedule was critical, the Kimley-Horn team collaborated with the general contractor to locate the underground detention vault where crane impacts would be minimized, saving the project over $1 million in structural cost and providing an improved schedule.
Kimley-Horn has served as a consultant on 160+ LiveNation sites over the past
3 years from coast-to-coast. Our team has provided peer reviews and served as
an on-site client representative we know what works and what doesn’t.
Designed an intensive traffic management plan that directs 120,000 patrons and includes on- and off-site parking with shuttle service, contra-flow lanes, signing, striping, signalization, and vehicle routing at the Circuit of the Americas Formula 1 track in Austin, TX.
Improved pedestrian flow and safety, and concourse and entry design through innovative computer modeling at Target Field in Minneapolis, MN.

Suntrust Park and The Battery Atlanta |
Atlanta, GA
Kimley-Horn completed entitlements and design
for the ballpark and
mixed-use development
for the fastest delivered
MLB ballpark in history
—announcement to
first pitch.
Opened April 2017
Suntrust Park and The Battery Atlanta
atlanta, GA | Atlanta Braves
CIVIL | LANDSCAPE ARCHITECTURE | PARKING | TRAFFIC | PEDESTRIAN SAFETY | TRANSIT
Architect: Populous
tvsdesign, Goode Van Slyke,
Stanley Beaman & Sears
622 million
(projected)
60 acres overall
15-acre ballpark
41,000
seats
4,000
premium seats
Las Vegas Stadium |
LAS VEGAS, NV
Kimley-Horn determined how to move cranes across
the recently constructed USACE underground facility
and designed the site-specific pathways to keep
construction moving.
Opening Summer 2020
Las Vegas Stadium
LAS VEGAS, NV | LAS VEGAS RAIDERS
Due diligence | entitlements and permitting | civil and traffic
engineering | pedestrian and traffic modeling (ALPS) |
stormwater design | parking design and consulting
Architect: Manica Architecture
HNTB Corporation
1.9 billion
(projected)
62 acres
65,000 seats
100 executive seats
Mercedes-Benz Stadium |
Atlanta, GA
Designed to support
events, emergency vehicle access, and landscape planters, the 110,000-square-foot elevated plaza was constructed 50+ feet above ground level.
Opened August 2017
Mercedes-Benz Stadium
atlanta, GA | ATLANTA FALCONS + ATLANTA UNITED FC
CIVIL | STRUCTURES | PARKING | STORMWATER | PEDESTRIAN SAFETY
Targeting LEED
Platinum Certification
Architect: HOK
tvsdesign, Goode Van Slyke Architecture Stanley Beaman & Sears
1.5
billion
14.5 acres
2,000,000 SF
71,000
seats
190
suites
7,600
club seats
Target Field |
MINNEAPOLIS, MN
The stadium is
well-connected to the
city’s transit network,
with 8,000 people
traveling via METRO
light rail system.
Opened January 2010
Target Field
MINNEAPOLIS, MN
CIVIL | ENVIRONMENTAL | TRAFFIC MANAGEMENT PLAN | PEDESTRIAN MODELING & ANALYSIS
LEED
Silver Certified
Architect: Populous
Hammel, Green
and Abrahamson
545
million
8.5 acres
1,000,000 SF
42,000
seats
54
luxury suites
3,000
club seats