Case Study

Town of Cramerton, NC

Permeable Pavers 

for Parking Lot

Project Background

As the Town of Cramerton completed a stormwater master plan, the Town’s parking lot and adjacent roadways were identified as top priorities for infrastructure improvements. 

Due to the deterioration of the existing parking lot and localized street flooding, and with support from LaBella consultation, the Town decided to replace and expand the parking lot while incorporating necessary infrastructure upgrades into the area. 

pROJECT OWNER

Location

Project Size

Town of 
Cramerton, NC

17,371 

Square Feet

Cramerton, NC

Green Infrastructure

Status

Completed 2022

Permeable Pavers

Benefits

Improved water quality & drainage 

Enhanced landscape aesthetics
Reduced maintenance
Increased parking

ADA-compliant safety features

Planning 
& Financing

Project

Design

Site Evaluation

& Permitting

Construction

Process

Click on icons for more information.

Benching

Baffles

Paver Placement

Outcome

The new parking lot has significantly reduced the rate at which stormwater runoff leaves the site, increased parking capacity without expanding the site’s footprint, provided a great covered area for events, and enhanced the aesthetics for Town patrons.


The permeable pavers and layers of crushed stone filter and store stormwater, allowing it to drain off the site gradually over a span of two to five days. Previously, the gravel parking lot did not store stormwater, and any rain that fell on the site would run off within minutes. 

This extended drainage time reduces erosion and impervious area effluent compared to asphalt, releasing water as a small trickle over several days. 


The site can now manage the runoff from a 100-year storm event, which has a one percent chance of occurring each year and generates approximately seven inches of rainfall in a 24-hour period.

The prolonged drainage through the crushed stone beds under the pavers also helps remove sediment and debris from the stormwater.

The parking lot is now more accessible and user-friendly, featuring two access points, level grading, pedestrian-friendly walkways, and ADA compliance. In addition, the previously worn and disheveled parking lot is now visually enhanced with higher durability due to the new pavers.
 

Results

Parking Lot 

Improvements

  • Increased parking capacity to a total of 34 parking spaces

  • Shade sails and additional seating

  • Improved landscaping and enhanced aesthetics

  • Increased usability, access, and ADA-compliant safety features
Powered by Ceros

Project Background

As the Town of Cramerton completed a stormwater master plan, the Town’s parking lot and adjacent roadways were identified as top priorities for infrastructure improvements. 

pROJECT OWNER

Town of 
Cramerton, NC

Green Infrastructure

Permeable Pavers

Location

Cramerton, NC

Status

Completed 2022

Project Size

17,371 

Benefits

Improved water quality & drainage 

Case Study

Due to the deterioration of the existing parking lot and localized street flooding, and with support from LaBella consultation, the Town decided to replace and expand the parking lot while incorporating necessary infrastructure upgrades into the area. 

Planning 
& Financing

Project

Site Evaluation

Construction

Paver Placement

Baffles

Benching

Click on icons for more information.

Results

Outcome

Parking Lot 

Town of Cramerton, NC

The new parking lot has significantly reduced the rate at which stormwater runoff leaves the site, increased parking capacity without expanding the site’s footprint, provided a great covered area for events, and enhanced the aesthetics for Town patrons.