Analyze and optimize existing operations
Vyaire fine-tuned its operations and added shifts to optimized lines. The moves helped increase production by about threefold.
Acquire an
additional workforce
Spirit AeroSystems brought more than 1000 skilled people to support the effort, all of whom were eager to embrace an unprecedented challenge.
Open a larger plant
In Wichita, Kansas, Vyaire quickly turned a 55,000 square-foot building into a new plant, including assembly, testing facilities, and much more.
Achieving
the moonshot
Strengthen
the supply chain
Component manufacturers faced the same operational stresses Vyaire did, which were relieved through innovative expert interventions.
Achieving a production increase
from 6 to 600+ ventilators per day
Achieving a production increase
from 6 to 600+ ventilators per day