Location: Bridgwater, Somerset
Value: Confidential
Client: Agratas
Agratas
One of the largest battery manufacturing facilities in the UK, the site is expected to supply nearly half of the nation’s projected battery capacity for the automotive sector.
With design and construction happening in tandem the fast paced programme will enable battery production as early as 2026.
Selection of preferred supply chain partners for MEP, Envelope, Steel Frame and Clean rooms is critical to the delivery strategy.
Delivery is facilitated by our national agile and sector focused national approach.
Pushing productivity boundaries from the outset with record breaking delivery of piling across the site.
Our sector leadership team facilitate cross industry sharing of best practice and lessons learned with industry peers.
Location: Birmingham
One Centenary Way Value: £110m
Client: MEPC
Paradise Circus
PARADISCE CIRCUS
One of the largest battery manufacturing facilities in the UK, the site is expected to supply nearly half of the nation’s projected battery capacity for the automotive sector.
ONE CENTENARY WAY
Steel exoskeleton provided vertical and lateral stability to the structure, a design solution resulting from the need to construct above the A38 Queensway tunnel, which has remained operational throughout.
3 CHAMBERLAIN SQUARE
Low energy, low carbon building championing sustainability and innovation through design principles secured BREEAM Outstanding and NABERS 5* ratings at design stage – making it one of the UK’s most sustainable buildings.
A logistically challenging city centre site spanning the A38 Queensway.
Foundations incorporate a series of huge transfer trusses weighing a total of around 1,156 tonnes, the largest ever designed and constructed in the UK for a commercial building and were fabricated at a specially expanded factory.
Terracotta façade, all-electric infrastructure, and a SMART building design aimed at maximising occupant wellbeing.
3 Chamberlain Square Value: £110m
Location: Birmingham
Value: £110m
Location: Buckinghamshire
Client: Pinewood Studios
Pinewood Studios
PHASE I
Five film stages featuring complicated building envelope designed to create large acoustic and fire resistant spaces.
PHASE II
Fast track programme to deliver three sound stages, a special effect stage, associated ancillary buildings and soft and hard landscaping over a 12.5 hectare site.
3 CHAMBERLAIN SQUARE
Low energy, low carbon building championing sustainability and innovation through design principles secured BREEAM Outstanding and NABERS 5* ratings at design stage – making it one of the UK’s most sustainable buildings.
Stop-start process adopted during construction to allow the filming a Bond film in nearby studio with minimal disruption and cost to Pinewood.
Protecting and enhancing the ecology of the site was key.
Terracotta façade, all-electric infrastructure, and a SMART building design aimed at maximising occupant wellbeing.