Building what matters
Having worked in the Texas market since the late 1990s, Skanska established our San Antonio office in 2008. We build what matters for the San Antonio area, and have done so with exceptional service to our clients and our community. Our San Antonio portfolio includes more than 80 projects, with a proven track record of work delivered on time and within budget.
Skanska in San Antonio
Learn More
Learn more
Meet the Team
At a Glance
Executive Vice President- General Manager
Dennis Yung
Vice President
Business Development
Steve Lyons
Chris Hillyer
Contact Us
VP, Business Development
steve.lyons@skanska.com
210.301.7140 office
830.237.2337 cell
Our San Antonio portfolio includes more than 80 projects, with a proven track record of work delivered on time and within budget.
Viva San Antonio
Preconstruction Services
Local Engagement
Vice President - Account Manager
Matt McCaffrey
Markets We Serve
Corporate/Commercial
Government
K-12 Education
Healthcare
Higher Education
Job Order Contracting
Senior Vice President- Regional Director - Precon
Vice President - Operations Manager
Keith Sitzman
World's Best Employers
$50K- $200M+
Projects ranging from $50,000 to $200 million+
Dennis.Yung@skanska.com
chris.hillyer@skanska.com
steve.lyons@skanska.com
keith.sitzman@skanska.com
matt.mccaffrey@skanska.com
130
Projects completed in the last 10 years
$2.1B
Volume of local work in the last 10 years
Members of the Association of General Contractors of America
AGC
Net-zero carbon emissions by 2045
100%
Change the World List
2023 Fiesta Medal Winner
#3
#17
Steve Lyons
Our PROJECTS
Skanska breaks ground on new STEM building at Texas State University
Skanska, broke ground on Texas State University’s new Science, Technology, Engineering, and Math (STEM) Classroom Building, on Friday, August 16.
Read more
Winners of San Antonio's Best Places to Work 2024
Skanska is ranked as one of San Antonio Business Journal's Best Places to Work 2024.
Read more
Investor Spotlight: Skanska USA Inc.
SATX sat down with Steve Lyons, Vice President of Business Development at Skanska USA Inc., to find out more about this about this organization benefitting of San Antonio residents.
Read more
Raising over $130k for the Leukemia and Lymphoma Society
For the past ten years, Keith Sitzman, vice president – operations manager, and David Brewer, project executive, alongside our San Antonio team, have made significant strides in supporting the Leukemia & Lymphoma Society’s (LLS) Light the Night walk through heartfelt fundraising efforts.
Read more
Civic Park Awards
Hemisfair Civic Park Phase 1 project recently was selected for two prestigious awards.
Read more
Getting Final Four Ready
As the City of San Antonio prepares to host the NCAA Final Four at the Alamodome, our team is committed to making the improvements that will revitalize downtown destinations in time to host exciting events.
Read more
Skanska Breaks Ground on CHRISTUS Santa Rosa Hospital
Skanska, announces the groundbreaking of the CHRISTUS Santa Rosa Hospital - Westover Hills project in San Antonio. Construction began in early 2023 and is expected to be completed the first quarter of 2025.
Read more
Skanska Begins Construction on UTSA Training Facilities
Skanska broke ground on the new basketball and volleyball practice facility at The University of Texas at San Antonio. The significant milestone marked the start of construction of the new $35-million project.
Read more
Veterans: A key workforce solution
Ryan Aalsma, executive vice president/general manager discusses how hiring veterans can help address workforce shortages by tapping into their unique skills, discipline, and leadership qualities.
Read more
In the News
Forbes' 2024
Fortune Magazine
San Antonio Business Journal
tori.miller@skanska.com
Office Manager
Tori Miller
peggy.cook@skanska.com
Communications Director
Peggy Cook
Greater Chamber
#3
San Antonio Business Journal
Members of
Our New Home!
Since the Fall of 2022, we have called The Soto our new home. Located just north of Downtown San Antonio, our team looks forward to collaborating with our clients, designers and subcontractors in our new space. The building is Mass Timber construction and aligns with Skanska's commitment to sustainability.
To learn more about this location visit: https://www.thesoto.com/
Read more about our new location!
It’s part of our service culture and developing solid relationships with our clients and the community at large. Whether it’s developing fundraisers, participating in charity events, working with the community to solve problems, or just keeping them informed about the project, you can count on this Skanska team to support your efforts in the community.
Skanska participated in the 4th annual Clays for the Community event. With 44 teams and more than 200 people in attendance, the team raised over $138,000 to benefit CHRISTUS Friends Foundation.
Clays for the Community
Skanska has helped raise over $250,000 locally for the Leukemia and Lymphoma Society over the past ten years. Here, we are participating in the annual “Light the Night” walk in downtown San Antonio.
Leukemia and Lymphoma Society
Our San Antonio team donated Christmas gifts to children and their families at the Christus Health Children’s Hospital of San Antonio.
CHRISTUS Toy Drive
Skanska recently attended the Comal Education Foudation Spring Fling and was a title sponsor.
Comal Education Foundation
2024 Best Places to Work Medium Company Category
Regional Manager - Subcontractor Engagement
rosalyn.asher@skanska.com
Rosalyn Asher
Using knowledge and foresight to shape the way we live, work, and connect
Our Projects
We Build What Matters
At Skanska, we build for a better society. From hospitals to stadiums, airports to corporate headquarters, and power plants to tunnels and bridges, the important buildings and infrastructure we create help heal, educate, entertain and energize communities.
Skanska’s San Antonio leadership team actively engages with the local community, holding leadership roles in civic, philanthropic, and industry organizations focused on enhancing the quality of life across Central and South Texas. Alongside our dedicated team of over 70 professionals, we take pride in being active partners committed to creating a meaningful and lasting impact.
Leadership roles in the community
of San Antonio
Click the images to explore
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed sagittis a quam et suscipit. Sed euismod tortor quis lectus laoreet, eu finibus tellus consectetur. Etiam blandit diam sed magna mole ultricies. In luctus urna ut commodo consectetur.
Sed quis lacus congue arcu egestas rhoncus quis ac justo. Etiam vestibulum eleifend placerat. Duis semper imperdiet quam, id rhoncus libero fringilla eu. Cras auctor leo in accumsan iaculis. Donec ac tincidunt velit, quis venenatis tellus. Morbi venenatis augue ante, eget fermentum nisi sagittis eget.
Image 6
06
Learn more
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed sagittis a quam et suscipit. Sed euismod tortor quis lectus laoreet, eu finibus tellus consectetur. Etiam blandit diam sed magna mole ultricies. In luctus urna ut commodo consectetur.
Sed quis lacus congue arcu egestas rhoncus quis ac justo. Etiam vestibulum eleifend placerat. Duis semper imperdiet quam, id rhoncus libero fringilla eu. Cras auctor leo in accumsan iaculis. Donec ac tincidunt velit, quis venenatis tellus. Morbi venenatis augue ante, eget fermentum nisi sagittis eget.
Image 5
05
Learn more
Skanska contributed to the development of Civic Park — a downtown destination designed to welcome both locals and visitors alike.
San Antonio is the most visited city in Texas.
04
Learn more
Skanska renovated the Alamodome to help prepare it for the upcoming 2025 NCAA Final Four.
San Antonio has hosted seven NCAA Final Fours and major national sports tournaments
03
Skanska proudly participates in Fiesta San Antonio and received 3rd place for our custom-designed 2023 Fiesta medal.
San Antonio is famous for the Alamo, the River Walk, Fiesta, and the best Tex-Mex cuisine you can find.
02
Did you know?
San Antonio is home to one of the largest concentrations of military bases in the U.S.
01
Apodaca ScienceBuilding
Western Carolina University
Cullowhee, NC
Science research labs
Instructional labs
New STEM building
Flexible classrooms
Office space
Relevancy to KSU
Proposed Team
Project Executive
Matt Frey
Super
David Hunter
APM
Martin Schmedt
Super
Richard Conage
Precon
Kayle Gastley
Precon
Lee Mahaley
Precon
Cathy Howell
PM
Greg Cooper
On this new construction project, our team:
Built a new STEM facility that supports Biology, Chemistry and Physics, Math and Computer Science, Geo sciences and Natural Resources, Forensic Anthropology, and Forensic Science departments and programs
Created wet teaching laboratories that support biology,hydrology, chemistry, organic chemistry, synthetic, hybrid, forensics, cellular/molecular and genetics and multiple research labs
Constructed a herbarium and sandbox space for learning/collaborative projects for faculty and students
Office
Atlanta
Services Performed
Preconstruction
Construction
Type or Method
New construction
Construction Manager
Cost
$88 million
Square Footage
184,700-SF
Dates of Service
July 2018 - March 2022
Apodaca ScienceBuilding
Western Carolina University
Cullowhee, NC
Science research labs
Instructional labs
New STEM building
Flexible classrooms
Office space
Relevancy to KSU
Proposed Team
Project Executive
Matt Frey
Super
David Hunter
APM
Martin Schmedt
Super
Richard Conage
Precon
Kayle Gastley
Precon
Lee Mahaley
Precon
Cathy Howell
PM
Greg Cooper
On this new construction project, our team:
Built a new STEM facility that supports Biology, Chemistry and Physics, Math and Computer Science, Geo sciences and Natural Resources, Forensic Anthropology, and Forensic Science departments and programs
Created wet teaching laboratories that support biology,hydrology, chemistry, organic chemistry, synthetic, hybrid, forensics, cellular/molecular and genetics and multiple research labs
Constructed a herbarium and sandbox space for learning/collaborative projects for faculty and students
Office
Atlanta
Services Performed
Preconstruction
Construction
Type or Method
New construction
Construction Manager
Cost
$88 million
Square Footage
184,700-SF
Dates of Service
July 2018 - March 2022
Apodaca ScienceBuilding
Western Carolina University
Cullowhee, NC
Science research labs
Instructional labs
New STEM building
Flexible classrooms
Office space
Relevancy to KSU
Proposed Team
Project Executive
Matt Frey
Super
David Hunter
APM
Martin Schmedt
Super
Richard Conage
Precon
Kayle Gastley
Precon
Lee Mahaley
Precon
Cathy Howell
PM
Greg Cooper
On this new construction project, our team:
Built a new STEM facility that supports Biology, Chemistry and Physics, Math and Computer Science, Geo sciences and Natural Resources, Forensic Anthropology, and Forensic Science departments and programs
Created wet teaching laboratories that support biology,hydrology, chemistry, organic chemistry, synthetic, hybrid, forensics, cellular/molecular and genetics and multiple research labs
Constructed a herbarium and sandbox space for learning/collaborative projects for faculty and students
Office
Atlanta
Services Performed
Preconstruction
Construction
Type or Method
New construction
Construction Manager
Cost
$88 million
Square Footage
184,700-SF
Dates of Service
July 2018 - March 2022
Apodaca ScienceBuilding
Western Carolina University
Cullowhee, NC
Science research labs
Instructional labs
New STEM building
Flexible classrooms
Office space
Relevancy to KSU
Proposed Team
Project Executive
Matt Frey
Super
David Hunter
APM
Martin Schmedt
Super
Richard Conage
Precon
Kayle Gastley
Precon
Lee Mahaley
Precon
Cathy Howell
PM
Greg Cooper
On this new construction project, our team:
Built a new STEM facility that supports Biology, Chemistry and Physics, Math and Computer Science, Geo sciences and Natural Resources, Forensic Anthropology, and Forensic Science departments and programs
Created wet teaching laboratories that support biology,hydrology, chemistry, organic chemistry, synthetic, hybrid, forensics, cellular/molecular and genetics and multiple research labs
Constructed a herbarium and sandbox space for learning/collaborative projects for faculty and students
Office
Atlanta
Services Performed
Preconstruction
Construction
Type or Method
New construction
Construction Manager
Cost
$88 million
Square Footage
184,700-SF
Dates of Service
July 2018 - March 2022
Apodaca ScienceBuilding
Western Carolina University
Cullowhee, NC
Science research labs
Instructional labs
New STEM building
Flexible classrooms
Office space
Relevancy to KSU
Proposed Team
Project Executive
Matt Frey
Super
David Hunter
APM
Martin Schmedt
Super
Richard Conage
Precon
Kayle Gastley
Precon
Lee Mahaley
Precon
Cathy Howell
PM
Greg Cooper
On this new construction project, our team:
Built a new STEM facility that supports Biology, Chemistry and Physics, Math and Computer Science, Geo sciences and Natural Resources, Forensic Anthropology, and Forensic Science departments and programs
Created wet teaching laboratories that support biology,hydrology, chemistry, organic chemistry, synthetic, hybrid, forensics, cellular/molecular and genetics and multiple research labs
Constructed a herbarium and sandbox space for learning/collaborative projects for faculty and students
Office
Atlanta
Services Performed
Preconstruction
Construction
Type or Method
New construction
Construction Manager
Cost
$88 million
Square Footage
184,700-SF
Dates of Service
July 2018 - March 2022
Apodaca ScienceBuilding
Western Carolina University
Cullowhee, NC
Science research labs
Instructional labs
New STEM building
Flexible classrooms
Office space
Relevancy to KSU
Proposed Team
Project Executive
Matt Frey
Super
David Hunter
APM
Martin Schmedt
Super
Richard Conage
Precon
Kayle Gastley
Precon
Lee Mahaley
Precon
Cathy Howell
PM
Greg Cooper
On this new construction project, our team:
Built a new STEM facility that supports Biology, Chemistry and Physics, Math and Computer Science, Geo sciences and Natural Resources, Forensic Anthropology, and Forensic Science departments and programs
Created wet teaching laboratories that support biology,hydrology, chemistry, organic chemistry, synthetic, hybrid, forensics, cellular/molecular and genetics and multiple research labs
Constructed a herbarium and sandbox space for learning/collaborative projects for faculty and students
Office
Atlanta
Services Performed
Preconstruction
Construction
Type or Method
New construction
Construction Manager
Cost
$88 million
Square Footage
184,700-SF
Dates of Service
July 2018 - March 2022
San Antonio is a city full of heart — rich in culture, history, and community pride. From iconic destinations to major milestones, Skanska is proud to build alongside it.
Skanska built key facilities at Lackland Air Force Base in 2016, supporting the infrastructure of our nation's service members.
Did you know?
Did you know?
Did you know?
We take pride in our work on Civic Park, which led our local office to host its first Bring Your Kid to Work Day, welcoming nearly 50 children to learn about careers in construction.
Inspiring Future Builders
Skanska Metriks
Strategic Supply Chain
Market Trends
We pride ourselves on providing accurate estimating advice to our customers at the earliest design stages through final cost. By looking beyond costs, we can significantly improve design and efficiency. Traditionally, building costs evolve alongside the design. As a result, project teams are often forced to compromise the building’s appearance or functionality to remain on budget. We developed Skanska Metriks out of the need for a better roadmap to the design-to-budget process; rather than relying on reactive value engineering exercises, it enables teams to focus on proactive value optimization.
Skanska Metriks™
To navigate current market conditions, we will rely on Skanska’s Market Trends Report—a quarterly analysis that provides key insights into construction market dynamics across Texas and the U.S. This report is a vital resource that helps us stay ahead of economic shifts and supply chain fluctuations by informing our approach to escalation strategies, material selection, and scheduling for long-lead items.
Market Trends
As part of Skanska’s Strategic Supply Chain (SSC) program, we have formed strong relationships with
national manufacturers and local distributors to help our customers receive access to the materials
and equipment they need. Through these strategic partnerships, we are often able to recommend costsaving alternatives, decrease lead times and lock in more favorable pricing.
Current Strategic Supply Chain Partners
Strategic Supply Chain
Click here to view our latest Metriks™ data
Click here to see our latest Market Trends Report.
Cost estimating from programming phase through construction documentation
In-house MEP estimating
Design to budget management, using real-time procedures and techniques
Value management (SAVE International certified professionals)
Constructability analysis
Cash flow analysis
Benchmarking and cost modeling analysis for capital budgeting
LEED® certification planning and management
Project execution planning
Life cycle analysis and energy modeling
BIM and VDC applications
Facility assessments
ASHRAE energy audits
Water conservation studies
Market research
Procurement planning
Below is a representative list of the preconstruction services we offer:
Doing Business with Skanska
Join us in shaping our world
Careers
Click here
For construction subcontractors
Prequalify with Skanska
Skanska’s online platform for construction subcontractors bidding opportunities.
Join Skanska on BuildingConnected
For non-construction subcontractors (office equipment and supplies, catering, professional services, etc.
Register as a Diverse Non-Subcontractor
Click here
Click here
National Buying Power
Optimal outcomes
Learn More
Learn More
Our Strategic Supply Chain team
Market analysis
Learn More
Learn More
Skanska’s Market Trends Report
Learn More
Learn More
Market Trends Live Webinar
Informative deep dives
The Strategic Supply Chain (SSC) team develops agreements with leading industry manufacturers that provide critical assets like air handlers, generators, switchgear, modular pods and pharmaceutical manufacturing-specific equipment. Working with these manufacturing partners, the SSC team supports early design value management, optimal product selection and best total cost and initial pricing for materials and equipment. Ultimately, their work optimizes design cost during preconstruction and mitigates schedule risk due to supply chain uncertainty.
Our Strategic Supply Chain team
Optimal outcomes
Each quarter, we publish an up-to-date analysis of the market, nationally and regionally, that helps our clients, partners and teams better understand local and national market trends and risks. This helps inform our escalation strategies, material selections and schedule planning for long-lead materials.
Skanska’s Market Trends Report
Market analysis
Read our latest Market Trends Report
Register for the Webinar
Following up our report, Skanska preconstruction and operations experts discuss the report’s findings, from construction pricing to labor trends, which are based on data compiled by sources like the U.S. Bureau of Labor Statistics and Engineering News Record. Guest speakers and subject matter experts from across the AEC industry join the webinar to share their experiences, best practices and lessons learned.
Market Trends Live Webinar
Informative deep dives
Click below to learn more.
Data-informed Project Planning
Preconstruction on another level
98% budget-to-actual accuracy
Beyond benchmarking with Skanska Metriks
Schedule assurance withLead Time Dashboard
This dashboard visualizes the latest equipment and material lead times—more than 180 key pieces like lab casework and generators—as reported directly by manufacturers. With this data, we are better informed during early schedule planning and quickly anticipate potential project delays resulting from fluctuating lead times.
Schedule assurance with Lead Time Dashboard
This proprietary tool harvests nearly 400 quantifiable attributes, like structural steel and specific program areas, from every project we build to help validate and optimize programming, planning and costs. This helps us quickly identify options that deliver higher value without sacrificing functionality.
Beyond benchmarking with Skanska Metriks
98% budget-to-actual accuracy
On projects—some valued at hundreds of millions of dollars—we consistently transition seamlessly from conceptual imagination in preconstruction to practical delivery in construction, on average, with a 98 percent budget-to-actual accuracy. This is impressive when considering economic uncertainty and ever-changing project requirements and needs.
The industry-standard definition of preconstruction is just a small part of our services. Our project planning group takes estimating and scheduling to the next level by incorporating strategic, data informed approaches to the supply chain, sustainability and more. During each design phase, we provide a complete estimate, and this includes filling in the gaps when the design is incomplete or in development. For example, even if the design documents don’t show water and sanitary lines to a restroom, we know they will be present in the final design and should be included in early estimates. Our goal is always to price what the project will cost when it’s complete.
Preconstruction on another level
Skanska USA Building
711 Broadway, Suite 305 | San Antonio, Texas 78215
210.301.7100
Register Now
Our Projects
Skanska in San Antonio
Clays for the Community
Contact Us
LinkedIn
LinkedIn
LinkedIn
LinkedIn
LinkedIn
LinkedIn
LinkedIn
LinkedIn

City Tower Renovations
City of San Antonio
Learn More
Westover Hills Hospital Bed Expansion
Christus Health
Learn More
DSO Administration Complex
The Alamo Colleges
Basketball and Volleyball Facility
UTSA
Learn More
Department of Tourism, Hospitality and Culinary Art
The Alamo Colleges
Learn More
Hospital Expansion and Renovations
HCA Methodist
Learn More
Lackland Ambulatory Care Center
Learn More
Making a difference in the San Antonio area
Project Highlights
Our Projects
STEM Classroom Building
Texas State University
Learn More
U.S. Army Corps of Engineers
City Tower Renovations
City of San Antonio
Description
$75 million, 500,000-GSF renovation of 22 levels of the Frost Bank headquarters building in downtown San Antonio. The building consolidates several departments to hold 23 city departments and approximately 1,500 city employees. The project also provides five floors for tenant offices in the tower and some retail space on the street level. The concourse (lower) level includes potential amenity spaces such as an exercise/wellness center, conference/meeting spaces, cafeteria/ food service, and a library department component.
Description
$2 million build out of 18 patient rooms on floors 4, 5, and 6 in the existing Christus Westover Hills Patient Tower. Project consist of six patient rooms on each floor which includes one isolation room on each floor. Scope included two new exhaust fans on the roof and tying into existing MEP infrastructure inside the hospital.
Westover Hills Hospital Bed Expansion
Christus Health
Description
$45 million, 160,000-SF Class A office building with "ballroom" office suites by departments utilizing modular walls to maximize flexibility. The project includes a conference center with boardroom, Alamo Colleges Police Headquarters, 24/7 Fire Alarm Monitoring Station, and DPS dispatch. There is also shell space for a UPS store, bookstore and food service vendors. In addition, the project includes a chiller plant to support the building's sustainable features and systems. The project also includes 900 surface parking spaces.
District Support Operations Administration Complex
The Alamo Colleges
Description
$100 million, 155,900-SF new five-story STEM (Science, Technology, Engineering, and Math) classroom building will house the computer science and math departments and will be designed to provide instructional space, student workspace, tutoring and testing space, administrative space, research space and meeting space. Additional scope includes site and utility improvements/upgrades in this portion of the campus to provide an efficient and functional facility to its users.
STEM Building
Texas State University
Description
$35 million, will be located next to the Roadrunner Athletics Center of Excellence on Barshop Blvd. and will house the daily operations of the UTSA men’s and women’s basketball and volleyball programs.
It will feature two full-sized NCAA practice courts, locker rooms and a team lounge for each program, a weight room, an athletic training/hydrotherapy space, team meeting rooms and coaches’ offices for each of the three programs.
Basketball and Volleyball Facility
UTSA
Description
On this project, our team provided preconstruction and construction services for a $28 million, 62,000-SF four-story facility with general instructional spaces, administrative offices, common spaces, and teaching kitchens/classrooms to serve the Alamo Community College St Philip's College's growing culinary arts, tourism and hospitality programs.
Department of Tourism, Hospitality and Culinary Arts
The Alamo Colleges
Description
$205 million, multiphase project with 518,000-SF of new construction, 92,000-SF in renovations, mass excavation and site and utility work. The new children’s tower added 96 beds, a PICU, medical and surgery beds, an expanded NICU, same-day surgery unit and central sterile area. The new central bed tower has 292 adult medical/surgery beds and 76 adult ICU beds. The project also included a 411,000-SF, 13-level precast parking garage and renovations to the pediatric acute care unit and imaging in the central tower.
Hospital Expansion and Renovations
HCA Methodist
Description
$206 million, 700,000-SF, state-of-the-art ambulatory care center—the largest ever built by the Department of Defense. The main facility incorporated a main entry concourse, health clinic, central sterilization, surgery suites, urgent care, and diagnostic services. The project also included command offices, 100 conference rooms and a 26-acre site package with utilities work and hardscape improvements. The building was constructed to LEED® Gold certification standards.
Lackland Ambulatory Care Center
U.S. Army Corps of Engineers
Connect with us
Skanska USA Building Inc.
usa.skanska.com
711 Broadway, Suite 305
San Antonio, Texas 78215
210.301.7100
In Progress Projects
$42.3 million, 76,000-SF phased demolition and reconstruction of the Knipling-Busland U.S. Livestock Insects Research Laboratory campus. Work includes construction of a new 46,000-SF administration and laboratory building, an 8,000-SF fly and tick research building, 16,000-SF of ancillary space, and new site roads and utilities.
Learn more about this project
Description
Civic Park is a nine-acre public park in San Antonio’s downtown core managed by Hemisfair Park Area Redevelopment Corporation (HPARC). Located within the former 1968 World's Fairgrounds, the park is adjacent to the River Walk and several vibrant and growing neighborhoods. Civic Park is the second of three public parks in the Hemisfair redevelopment and will be a world-class outdoor gathering place. Civic Park Phase 1 will include construction of the Shallows and Promenade water features, the Great Lawn, restroom building, sprawling natural stone blocks and pavers and new utilities, including free public WiFi.
Hemisfair Civic Park
City of San Antonio
USDA Agricultural Research Service
Description
U.S. Army Corps of Engineers
$79.9 million, 120,000-SF new construction for a middle school which also includes the construction of sports facilities such as a baseball field, softball field, running track, tennis court, football field, sports storage, and restroom building. The site construction includes heavy-duty pavement for fire and school bus lanes and light-duty pavement for automobile parking areas. Site includes various utility connections including water, sanitary, electrical and gas connection to the local utility providers. This includes the extension of an existing effluent line from the south side of the property to the north side of the property.
Middle School
Description
Comal Independent School District
$95 million, 170,000-SF addition of patient rooms.
Westover Hills Patient Tower Expansion
Description
Christus Health
In Progress
In Progress
Home
Learn More
Skanska USA Building
711 Broadway, Suite 305 | San Antonio, Texas 78215
210.301.7100
Our Projects
Skanska in San Antonio
Clays for the Community
Contact Us