Predicting clashes beforethey happen
Learn how Building Information Modelling helps engineers visualise baggage handling system designs in 3D, spot potential issues and eliminate them
NEW Water Pipe
Power Cable
ACMV Return Air Duct
Plumbing Water Pipe
IT Cable Tray
Detected
A clash between
the planned baggage handling systemand existing IT cable tray.
Detected
A clash between
the planned baggage handling systemand existingNEWater pipe.
Detected
A clash between
the planned baggage handling systemand existingpower cable network.
Detected
A clash between
the planned baggage handling systemand existingAir Conditioning and Mechanical Ventilation (ACMV) Return Air Duct.
Detected
A clash between
the planned baggage handling systemand existingplumbing water pipe.