Vertiv™ Liebert® XDM Split Indoor Chiller
The Liebert® XDM Split Indoor Chiller is a liquid-to-fluid exchanger for rear door cooling applications that offers easy, cost-effective deployment in any data center.
The unit operates without facilities water and provides a chilled water secondary circuit, allowing you to tap into the benefits of water-cooled doors to more efficiently support higher rack densities without incurring the costs of significant infrastructure changes.
Vertiv™ Liebert® XDU
The Liebert® Coolant Distribution Unit is suitable for direct to chip and rear door cooling applications and offers easy, cost-effective deployment in any data center.
The Liebert® XDU is available in Liquid-to-Liquid and Liquid-to-Air designs, operating with or without facility water, allowing the customer to tap into the benefits of liquid cooling without incurring the costs of major infrastructure changes.
Vertiv™ Liebert® DCD
The Vertiv Liebert® DCD Rear Door Heat Exchanger is a highly efficient heat exchanger module that mounts on the rear of an IT rack, designed specifically for high heat density applications.
The hot air from the IT equipment passes through the rear door before entering back into the data center at room temperature, reducing the demand on room cooling infrastructure.
Liquid Cooling Services
IT and Facility teams can leverage partner project services to prepare for onsite liquid cooling installation, commissioning and start-up.
Project Phases and Services include:
Navigating application design
Conducting offsite testing
Providing project management
Installing the new system
Starting up systems
Handing over the new system
Teams will also want to investigate ongoing services from equipment manufacturers to protect costly liquid cooling systems and ensure effective operations; such as conducting remote monitoring, managing fluids, performing preventive maintenance, and overseeing asset management.
Project Phases and Services include:
Navigating application design
Conducting offsite testing
Providing project management
Installing the new system
Starting up systems
Handing over the new system